Today the property was a bee hive of activity. The masons put up quite a bit of block while the plumber trenched the front field to run the water line down from the road to the shop. He was also able to rough in the plumbing for the shop bathroom. Talk about excited, we could hardly stand ourselves for all the progress. Here are some shots of what we saw at the end of the day. If we're this excited now, we'll be positively giddy once walls start going up.
Pipe in the trench looking up toward the road
Looking from the berm to the shop
Pics of the roughed in plumbing, (these pics were made on my iPad 2)
That's as high as the block will go on the front and sides of the house.
And. last but not least, Duke power finally came and hooked up the power to the shop, no more temporary pole!!