At the same time the guys were trenching in the back, a contractor for Duke Power came to trench and install the power from the pole to the house. Of course, they chose the drainage ditch we just built to put it in and ended up filling it all back in. Fortunately, they did not cut through any water lines or upset sewer or drainage pipes, A little pick and shovel work and our drainage ditch is good to go.
Trim work is continuing with most of the windows and doors completely trimmed out. The 6 inch wide boards used for trim really looks great with the colors we have chosen. Phillip informed me today that tile and backer board should be delivered today and the tile and rock work will begin next week. By the time we return from San Diego, things should really look great.